Flexible masterplanning for a US military base

Germany

Filter projects by:

Market

  • Bridges

  • Cities

    Cities EMIA

  • Civilian Agencies

  • Commercial & Residential

    Mixed Use

    Office

    Residential

    Retail

  • Defense

  • Development

  • Education

    Colleges & Universities

    Schools

  • Energy

    Carbon capture, utilization and storage

    Geothermal

    Grid modernization

    Hydroelectricity

    Hydrogen

    Microgrids and energy storage

    Offshore wind

    Portfolio Decarbonization and Climate Resilience

    Solar

    The Energy Estate

    Transportation decarbonization

  • Healthcare

    Clinical Hospital

    Life Sciences

    Senior Living

  • Industrial

    Agriculture, Food & Beverage

    Automotive & Heavy Equipment & Machinery

    Digital Infrastructure

    High Performance Logistics

    Manufacturing

    Mining & Metals

    Pharmaceutical/Specialty Chemicals

    Pulp & Paper

  • Intelligence

  • Justice

  • Leisure

    Arts and Culture

    Hotels and Resorts

    Themed Entertainment and Mixed-Use

  • National Governments

    Civil Works

    Disaster Resilience

    Energy

    Environment

    Infrastructure & Facilities

  • Oil, Gas & Chemicals

    Chemical/Petrochemical

    Downstream

    Midstream

    Upstream

  • Regional & Local Government

  • Security

  • Sports and Venues

    Collegiate

    Convention Centers

    Olympics & Mega-Events

    Stadiums & Arenas

  • Transportation

    Aviation

    Bridges & Tunnels

    Connected and Autonomous Vehicles

    Freight Rail

    Highways & Roads

    Mass Transit

    Ports & Marine

    Transportation decarbonization

    Tunnels

  • Water

    Dams & Hydropower

    Flood and coastal resilience

    Industrial Water

    Tunnels, Conveyance, Collection & Distribution

    Wastewater Treatment & Reuse

    Water Treatment

    Watershed and Ecosystem Management

Service

  • AECOM Capital

  • Alternative Delivery Models

  • Architecture and Design

    Architecture

    Asset Advisory

    Interior Architecture

    Urbanism + Planning

  • Asset Advisory

    Building Consulting

  • Asset Management

  • Cities Solutions

  • Construction Management

  • Converged Resilience

  • Cost Management

  • Design Philosophy

  • Digital Infrastructure Services

  • Economics

  • Electric Vertical Takeoff and Landing Solutions

  • Engineering

    Ground Engineering

  • Environmental Services

    Air Quality Consulting and Engineering

    Climate Adaptation

    Digital EHS/ESG Solutions

    EHS Management Consulting and Compliance

    Environmental Contracting

    Environmental/Social Impact Assessment and Permitting

    Remediation, Restoration and Redevelopment

  • Environmental Sustainability

  • Finance

  • Geospatial and Data Services

  • IT and Cybersecurity

  • Locations

  • Mobilitics

  • Multinational Investment and Development

  • Operations and Maintenance

    Industrial and Commercial Operations and Maintenance

  • Pedestrian Modelling (North America)

  • PFAS

    PFAS Treatment Technology

  • Planning and Consulting

    Geospatial Services

    Pedestrian Modelling

  • Process Development & Implementation

  • Program Management

    Economic and Real Estate Advisory

  • Property Solutions

    Building Surveying

    Design Management

    Fiscal Incentives

    FM Consulting and Strategic Asset Management

    Health and Safety Consulting

    Specification Consulting

    Transaction Advisory

    Visualisation and Virtual Reality

  • Public-Private Partnerships

  • Risk Consultancy

  • Risk Management & Resilience

    Critical Infrastructure Protection

  • Simulation Models

    Rail Simulations

  • Strategic consulting

    People + Place Advisory

  • Transaction Technical Advisory Services

  • Transport Planning

  • Travel Demand Management

  • Tunnels, Trenchless Technology and Underground Infrastructure

  • Vertical Transportation Services (North America)

  • Visualization and Virtual Reality

Location

  • Africa

  • Antarctica

  • Australia

  • Azerbaijan

  • Bahrain

  • Bangladesh

  • Belgium

  • Bolivia

  • Bosnia and Herzegovina

  • Brazil

  • British West Indies

  • Canada

  • Caribbean-Puerto Rico

  • China

  • Colombia

  • Croatia

  • Czech Republic

  • Egypt

  • Eritrea

  • Finland

  • France

  • Germany

  • Greece

  • Greenland

  • Haiti

  • Hong Kong

  • India

  • Indonesia

  • Iraq

  • Ireland

  • Italy

  • Japan

  • Kenya

  • Kingdom of Saudi Arabia

  • Kuwait

  • Liberia

  • Lithuania

  • Malaysia

  • Maldives

  • Malta

  • Mauritania

  • Mexico

  • Monaco

  • Mongolia

  • Montenegro

  • Myanmar

  • Netherlands

  • New Zealand | Aotearoa

  • Norway

  • Oman

  • Panama

  • Papua New Guinea

  • Peru

  • Philippines

  • Poland

  • Portugal

  • Qatar

  • Romania

  • Singapore

  • Slovakia

  • South Africa

  • South Korea

  • Spain

  • Sri Lanka

  • Sweden

  • Switzerland

  • Taiwan

  • Turkey

  • Ukraine

  • United Arab Emirates

  • United Kingdom

  • United States

  • Vietnam

  • Worldwide

Find out how we planned and designed a large facility in unusual circumstances for a US military base in Bavaria, Germany.

Preparing the masterplan for any large industrial complex within a military base is a major assignment. When the exact site has yet to be confirmed, that task becomes even more demanding. 

We had to meet this challenge on a major US military base in Bavaria, Germany when we were asked to define the design criteria, programme of works, and cost estimates for a new industrial complex even though a decision on location had not yet been reached.  

The project was complex in other aspects, too. Some areas were to be used to store hazardous waste and maintain technical equipment while military personnel would be living and working in other parts of the facility. 

To deliver for the client in these exceptional circumstances, we marshalled a team of architects, planners and engineers from Germany, Spain and the US. Working as one team, they brought local regulatory knowledge and global planning best practices together to fully prepare the project for approval despite the variables.  

Rigorous planning and analysis 

Considering the differing requirements within the complex, we gathered as much information and data as we could, conducting stakeholder interviews and a requirements analysis that covered the project scope, square footage, environmental considerations as well as anti-terrorism/force protection requirements.  

As there were two locations under consideration, we also conducted site and risk assessments for both, alongside detailed environmental and economic analyses. On the latter, we used parametric costs to provide estimates which considered fluctuating elements such as shifts in the market, supply chain constraints as well as unscheduled construction works. 

All this information fed into a hybrid workshop – or planning charette – which we set up between all members of our international multi-disciplinary team. The goal of the workshop was to complete the analysis for both sites, refine the planning programme, develop the design vision and identify clear development goals. The output was a series of concept plans which also considered future construction stages.  

Identifying opportunities to reduce environmental impact 

AECOM is at the industry vanguard in terms of emissions reduction. Our ScopeX™ approach to decarbonisation encompasses all our capabilities, expertise and experience across infrastructure and buildings. This includes strategic planning, energy-efficient design, project development, generation and storage, stakeholder engagement and financing.  

Using these capabilities, we defined the facility’s energy targets and used innovative analysis methods to offset environmental impact against the option to add photovoltaic energy generation.  

We also performed an in-depth sustainable design analysis (which included preparing a preliminary LEED checklist) that exceeded the original scope requirements, contributing to net zero goals set by the US Government. 

Fast-tracked for delivery 

Thanks to the thorough approach to planning and design taken by the international team to get the project ready for approval despite the variables, the complex was placed in the top five list of priority projects, guaranteeing expedient project funding as a result.